A. Engineering
Approbations:
R.C.C = Reinforcement cement concrete
M.S = Mild steel
S.S = Stainless steel
C.C = Cement concrete
D.P.C = Damp proof coarse
N.C.F = Net cement finishing
B.F.S = Brick flat soling
H.B.B = Herring bone bond
C.I sheet= Corrugated iron sheet
A.C sheet = Asbestos cement sheet
D.M = Dry mortar
W.M=Weight mortar
L.C .C= Lime terracing
R.B = Reinforce brick
P.L = Plinth level
E.G.L = Existing ground level
H.F.L=Highest flood level
F.L = Flood level
F.M = Fineness modules
L.S = Lump sum
F.I.B = Flat iron bar
P.C.C = Plane cement concrete
C.P.M = Critical path method
PERT = Programmed Evaluation and review technique
T.P.T = Total project time
M.B = Measurement book
S.S.D = Stopping side distance
M.G.C=Maximum ground coverage
FAR=Floor area ratio
DAP=Detail area plan
BWG =British wire gaze
PSI= Pound per squire inch
G.I=Galvanized iron
PVC= Polyvinyl colorized
E.R.D=Emergency Rescue device
B.Conversion:-
1 Inch =25.40 mm =2.540 cm
1meter =3.281 feet = 1000 mm =100 cm
1 feet =12 inch =304.8 mm =30.48 cm
1 kg =2.205 pound = 1.027 seer
1 cubic meter =35.315 cft
1Squire meter =10.764 sft
1Squire inch =6.452 cm2
1 mile=1.609 km
1 gallon=4.546 liter (UK ) =3.64 (British) =3.7854 (U S)
1 mound =37.324 kg
1 ton =1000 kg =20 hondor =10 quintal
1 quintal = 100 kg =2 hondar =1.969 cwt
1 hondar =50 kg =.9845 cwt
1 hactor = 2.471 acor =10000 m2
1 Chata =720 sft =1.65 sotok
1 sotok plot area = 435.60 sft
1 bigha =20 katha= 33.33 sotok =14,520 sft
1 acorns = 100 decimal = 3 bigha =43,561 sft= 4047 m2
1 ft3=6.23901 gallon =28.316 liter
1 HP=.7457 kw=1550 ft-Ib/ sec
B. Estimation:-
1. a) 5" Brick work 100sft (1:4) = Require Bricks 480
nos, Cement 2.35 bag, Sand 12 cft.
b) 10" Brick
work 100cft (1:6) = Require Bricks 1150 nos, Cement 4 bag, Sand 30cft.
2. a) R.C.C work per 100 cft (1:1.5:3) = Require Cement 22
bag, Sand 40 cft,chips 80 cft.
b) R.C.C work per
100 cft (1:2:4) = Require Cement 18 bag, Sand 43 cft, Chips 85 cft.
3. a) C.C work per 100 cft (1:3:6) = Require Cement 12 bag,
Sand 45 cft Chips 90 cft.
b) C.C work per 100 cft (1:4:8) = Require Cement
9.5 bag Sand 47 cft, Chips 92 cft.
4. a) 3/4" Thick plastering work per 100 sft (1:4)= Require
Cement 1 bag, Sand 8 cft
b) 1/2" Thick
plastering work per 100 sft (1:4)= Require Cement .75 bag, Sand 5 cft
5. a)Lime Terracing (4")100 Sft (2:2:7) = Require lime 4
mound, Surki 9 cft, Chips 32 cft
b) Lime Terracing
(4") 100 Sft (2:2:7)= Require Chata gur 1.5kg, tatul1 kg, Khoyer 1 kg
6. a) Double Brick flat soling per 100 sft = Require Bricks 575
nos & sand 70 cft
b) Herring bone
bond per 100 sft= Requires bricks 480 nos & sand 70 cft
7. Brick on end edging for 100 rft = Requires bricks 240 nos
8. Brick work per sft & per cft = Need Bricks 4.5 nos
& 11.5 nos
9. Weight of R.C.C casting per 100 cft = 6800 kg, 1 m3 =2400
kg
10. Weight of stone per 100 cft = 5400 kg
11. Weight of sand per 100 cft = 4550 kg
12. Weight of Rod per 100 cft = 22 ton
13.a) Law of per meters rod =d²/162.2 (Deformed rod)
b) Law of per feet
rod = (Suta) ²/24 (Plane
rod)
14. Need dry mortar for any types of brick work =35% out of
total volume
15. a) Volume of cement per Bag = 1.25 cft
b) Weight of cement
per Bag = 50 kg
c) Cement volume
1 m3 = 30 bag
16. Need cement N.C.F per 100 sft = 28 kg
17. Measurement of upsized wood (tree) =Length ×diameter (s)
× diameter (b) /2304= cft
Wood (here,
lenth is measure of feet & diameter measure of inch)
18. a)Weight of MS
flat bar ,Angle,Plate,Z bar, Tee,1 m3 = 7850 kg
b) Weight
of MS flat bar ,Angle,Plate,Z bar, Tee,1
ft3= 490 pound
19. Lime concrete slab casting ratio = khoa: Surki: lime
(7:2:2)
20. a)Quantity of paddlu in D.P.C (1:2:4) work per bag
cement = 2.5 kg (5%)
b).Quantity Sam-seal
impermo in D.P.C (1:2:4) work per bag cement=1 kg
c) Require
bitumen /Asphalt per 100 sft D.P.C work = 1st coat 4.5 kg & 2nd
coat 3kg,
21. a) Machine broken 1000 nos picket = khoa 118 cft (3/4" size) & 110 cft. (1/2" size)
b) 100 cft hand
broken khoa or brick chips require 850 nos bricks
22. a) Standard length & breadth of C.I sheet =
6'-0", 7’-0", 8’-0", 9'-0", 10'-0" & 2'-8"
23.1 bandle sheet = 72 rft (Wide 2'-8"size)
24. Percentage of livable area out of plinth area = (50-65)
%
25. Percentage of Buildup area out of plot area = 2/3
divide
26 Percentage of Back filling volume out of excavation
volume = 1/5 divide
27. Rod binding work need 24 gaze G.l wire for per ton rod =
(4-5) kg
28. Dry volume of concrete, mortar = 1.5 × Wet volume
29.a) Need cement of Tiles work per 100 sft in floor (1:6) =
2 bag
b) Need cement of Tiles work per 100 sft in
wall (1:4) = 2.5 bag
30. a) Standard size of bricks
=9.5"×4.5"×2.75"
b) Size of bricks
with mortar =10"×5"×3"
c) Standard
bricks 1000 nos=Approx 72 cft =2.039 m3=3172 to 4000 kg
31. Labor cost of building construction =Total cost ×15%
32. White wash per 1000 sft =Need lime18.66 kg, Gum 0.30 kg,
blue 0.20 kg
33. Color wash per 1000 sft =Need lime18.66 kg, Gum 0.30 kg,
pigment 1.0 kg
34. Cement paint per kg /per coat =100 sft surface
35. Weather coat per kg /per coat =150 sft surface
36 Synthetic enamel (primer) per liter/ per coat =125 sft
surface
37. Synthetic enamel (paint) per liter/ per coat =180 sft
surface.
38. Distemper (primer) per liter/ per coat =125 sft surface.
39 Distemper (paint) per liter/ per coat =220 sft surface.
40. Plastic (primer) per liter/ per coat =125 sft surface.
41. Plastic (paint) per liter/ per coat =160 sft surface.
42.1 gallon of plastic emulsion/synthetic enamel paint
covers 300 sft of new surface
49. 1 gallon of distemper covers 250 sft of new surface
50 1 tin (40 kg) of cement paint covers 2475 sft surface
49.1 mound of slaked lime or surki =2.25 cft
49. 950 rft of barbed wire (12 BWG) = 1 cwt =0.508 quintal
=1 handor = 50.8 kg
C. Costing:-
D. Civil Design:-
01. Per hook length of MS ber= 10D
02. Per nos straight rod length with both side hook =L+20D
03. Per nos Crank Bar length with 2 crank & both side
hook =L+2×0.5d+20D
04. Per nos Stirrup length =2(A+B) +3 inch
05. Need degree of Crank Bar = 45 degree
06. Per nos Crank Bar length & distance =0.45d & 30
feet
07. Lap consider length =20'-0" to up
08. Lap length of tensile & compression zone without
hook = 30D& 24D
09. Lap length of tensile & compression zone with hook =
60D & 44D
10. Actual size of normal bricks =
9.5"×4.5"×2.75”, (24.2 cm ×11.4cm×7cm)
11. Normal bricks size with mortar =
10"×5"×3", (25.4 cm ×12.7cm×7.6cm)
12. Normal crank cone =45˚
13. Column crank ratio = 1:12
14. Circular column tie rod length = λ (D-2×covering)
+hook
15. Spiral rod length =Nλ (D+d) +8d
E. Construction:-
Shuttering Vertical member & horizontal member = Proof
& Dacha
Cement primary & final setting time =30 min & 24
hour
Enamel paint useable area of grill, railing, steel door
& window, all types of steel section, wooden section, kitchen, Bath .
Plastic paint useable area of all types of Interior wall.
Distemper paint useable area Room & verandah Ceiling.
Cement Paint useable area of exterior wall & ceiling.
Weather Coat useable area of exterior wall & ceiling.
Slope ratio of west water line=1 inch per 20 feet
Slope ratio of soil line=1 inch per 30 feet
Soil, west water, rain water vertical line normally use
4"dia uPVC pipe
Sanitary vertical gas & horizontal west water line
normally use 2"dia uPVC pipe
Under ground Sanitary line normally use (6-12)" dia
R.C.C / PVC pipe
Overhead tank use normally input 1.5", delivery
3", overflow 1.5", wind 1/2",& wash 2" dia G.I / Pvc
thread pipe .
Water Reserve tank
use normally input 2", delivery 2", overflow 1"& wash
2" dia G.I / Pvc thread pipe
C.Setback Role:-
Sl
No
|
Plot Size
|
Minimum Setback
|
||
Front (meter)
|
Back (meter)
|
Side
(meter)
|
||
01
|
Up to 2 Catha (1440 sft)
|
1.50
|
1.00
|
0.80
|
02
|
Over 2 chata to 3 catha (2160 sft)
|
1.50
|
1.00
|
1.00
|
03
|
Over 3 chata to 4 catha (2880 sft)
|
1.50
|
1.50
|
1.00
|
04
|
Over 4 chata to 20 catha (3,000-14,400 sft)
|
1.50
|
2.00
|
1.25
|
05
|
Over 20 catha (Up to 10 storied)
|
1.50
|
2.00
|
1.50
|
06
|
Over 20 catha (Over 10 storied)
|
1.50
|
3.00
|
3.00
|
D. FAR& MGC Calculation:- For Residential Building
Sl
No
|
Plot Size
|
Wide of Road
(Meter)
|
FAR
|
MGC
(%)
|
01
|
Up to 2 Catha (1440 sft)
|
6.00
|
3.15
|
67.50
|
02
|
Over 2 chata to 3 catha (2160 sft)
|
6.00
|
3.35
|
65.00
|
03
|
Over 3 chata to 4 catha (2880 sft)
|
6.00
|
3.50
|
62.50
|
04
|
Over 4 chata to 5 catha (3600 sft)
|
6.00
|
3.50
|
62.50
|
05
|
Over 5 chata to 6 catha (3600 sft)
|
6.00
|
3.75
|
60.00
|
06
|
Over 6 chata to 7 catha (3600 sft))
|
6.00
|
3.75
|
60.00
|
07
|
Over 7 chata to 8 catha (3600 sft))
|
6.0
|
4.00
|
60.00
|
08
|
Over 8 chata to 9 catha (3600 sft))
|
6.00
|
4.00
|
60.00
|
09
|
Over 9 chata to 10 catha (3600 sft))
|
6.00
|
4.25
|
57.50
|
10
|
Over 10 chata to 12 catha (3600 sft)
|
9.00
|
4.50
|
57.50
|
11
|
Over 12 chata to 14 catha (3600 sft)
|
9.00
|
4.75
|
55.00
|
12
|
Over 14 chata to 16 catha (3600 sft)
|
9.00
|
5.00
|
52.50
|
13
|
Over 16 chata to 18 catha (3600 sft)
|
9.00
|
5.25
|
52.50
|
14
|
Over 18 chata to 20 catha (3600 sft)
|
9.00
|
5.25
|
50.00
|
15
|
Over 20 catha (Over 10 storied)
|
12.00
|
5.50
|
50.00
|
16
|
Infinities
|
18.00
|
6.00
|
50.00
|
17
|
Infinities
|
24.00
|
6.50
|
50.00
|
E. Analysis:-
Analysis for R.C.C work (1:1.5:3) (Stone Chips)
Considering=100Cft of work
1. Portland Cement 22
bag @Tk.370.00=8,140.00
2. Stone chips 82 cft @ Tk.100.00=8,200.00
3. Syllet Sand
25 cft @ Tk.20.00=500.00
4. Local Sand
16 cft @ Tk.12.00=192.00
Cubic feet to Square feet Convertion Table
1 cubic feet =
|
1 ft2
|
1 ft2 =
|
1 cubic feet
|
2 cubic feet =
|
1.5874 ft2
|
2 ft2 =
|
2.8284 cubic feet
|
3 cubic feet =
|
2.0801 ft2
|
3 ft2 =
|
5.1962 cubic feet
|
4 cubic feet =
|
2.5198 ft2
|
4 ft2 =
|
8 cubic feet
|
5 cubic feet =
|
2.924 ft2
|
5 ft2 =
|
11.1803 cubic feet
|
6 cubic feet =
|
3.3019 ft2
|
6 ft2 =
|
14.6969 cubic feet
|
7 cubic feet =
|
3.6593 ft2
|
7 ft2 =
|
18.5203 cubic feet
|
8 cubic feet =
|
4 ft2
|
8 ft2 =
|
22.6274 cubic feet
|
9 cubic feet =
|
4.3267 ft2
|
9 ft2 =
|
27 cubic feet
|
10 cubic feet =
|
4.6416 ft2
|
10 ft2 =
|
31.6228 cubic feet
|
11 cubic feet =
|
4.9461 ft2
|
11 ft2 =
|
36.4829 cubic feet
|
12 cubic feet =
|
5.2415 ft2
|
12 ft2 =
|
41.5692 cubic feet
|
13 cubic feet =
|
5.5288 ft2
|
13 ft2 =
|
46.8722 cubic feet
|
14 cubic feet =
|
5.8088 ft2
|
14 ft2 =
|
52.3832 cubic feet
|
15 cubic feet =
|
6.0822 ft2
|
15 ft2 =
|
58.0948 cubic feet
|
16 cubic feet =
|
6.3496 ft2
|
16 ft2 =
|
64 cubic feet
|
17 cubic feet =
|
6.6115 ft2
|
17 ft2 =
|
70.0928 cubic feet
|
18 cubic feet =
|
6.8683 ft2
|
18 ft2 =
|
76.3675 cubic feet
|
19 cubic feet =
|
7.1204 ft2
|
19 ft2 =
|
82.8191 cubic feet
|
20 cubic feet =
|
7.3681 ft2
|
20 ft2 =
|
89.4427 cubic feet
|
21 cubic feet =
|
7.6117 ft2
|
21 ft2 =
|
96.2341 cubic feet
|
22 cubic feet =
|
7.8514 ft2
|
22 ft2 =
|
103.1891 cubic feet
|
23 cubic feet =
|
8.0876 ft2
|
23 ft2 =
|
110.3041 cubic feet
|
24 cubic feet =
|
8.3203 ft2
|
24 ft2 =
|
117.5755 cubic feet
|
25 cubic feet =
|
8.5499 ft2
|
25 ft2 =
|
125 cubic feet
|
26 cubic feet =
|
8.7764 ft2
|
26 ft2 =
|
132.5745 cubic feet
|
27 cubic feet =
|
9 ft2
|
27 ft2 =
|
140.2961 cubic feet
|
28 cubic feet =
|
9.2209 ft2
|
28 ft2 =
|
148.1621 cubic feet
|
29 cubic feet =
|
9.4391 ft2
|
29 ft2 =
|
156.1698 cubic feet
|
30 cubic feet =
|
9.6549 ft2
|
30 ft2 =
|
164.3168 cubic feet
|